The purpose of this test program is to perform proof load verification on cold bonded insert rings installed in representative sandwich panels.
The objective is to demonstrate the structural integrity and bonding strength of sandwich cold bonded inserts used for lifting operations.
A Force vs. Displacement graph is presented below.
